Project Overview
Client: St Mary Star of the Sea
Builder: Trinity Fitout & Constructions
Location: Hurtsville, NSW
Project Type: Educational Fitout
Date Completed: 2023
Project Overview
This project involved the manufacture and installation of a full suite of stainless-steel workstations, sinks, storage units and base cabinetry for a commercial teaching kitchen and preparation space. The joinery was designed to provide a durable, hygienic, and highly functional environment suitable for high-frequency educational use.
The scope comprised multiple stainless-steel benchtops with integrated sinks and wet edges, fixed base cabinetry with adjustable shelving, drawer banks, appliance accommodation, bin recesses, and overhead storage. Each workstation was precisely coordinated to align with existing services and meet strict compliance requirements for a food-safe and education-grade facility.
Finishes
Benchtops Stainless steel benches throughout, including splashbacks and wet edges, custom fabricated to suit each station
Sinks & TapwareStainless steel inset sinks with integrated drainers, commercial-grade tapware
CabinetryWhite laminate finish to all base cabinets and drawer units
HandlesSatin stainless steel pull handles
Carcase ConstructionMoisture-resistant board suitable for commercial kitchen and school use
Leg SystemHeavy-duty adjustable stainless-steel legs with black feet
OverheadsLaminate overhead cupboards with matching stainless-steel handles




